Create Engineering

Skip to content
 

Content

Port Edgar MSSC

06/05/2020

Attached are a few pictures of the scheme developing at Port Edgar for the Marine Society and Sea Cadets.
Including the structural decking laid with shear studs and mesh reinforcement being installed, then the timber framed walls installed within the steel frame and finally a few pictures once the scaffolding came down.
Hoping to provide a few as-built pictures in a future post.